Destructions on Sri Jasmin

Below are some of the pictures taken on 24 Aug 2008. If the JMB is not formed, more serious problems will surface.
This is the main water pipe.
This is the main tanki, where the "hole" is actually an the excavation & fixing of the underground piping took place.
This is the 3 Grundfos pump to pump water to 7 blocks.
This is the 3 Grundfos pump to pump water to 4 blocks. Look closely, left pump leaking.
This is what the aluminum door at the ground floor underneath the stairs suppose to be.
This is what's happening to most blocks, we don't need to put this side by side to launch a game of spot what's missing.
This is one of the apartments were you will be forgiven for thinking someone tried some experiment.
Act of sabotage? Why cut the electrical cables?
This is one the untenanted living rooms of sri jasmin apartment.
This is another untenanted "kitchen" of sri jasmin apartment.
This is on the ground floor where windows has been stripped.
The aluminum frame has been removed & the window panes just left in the room. Well, looks like they can't strip the frame that is attached to the wall. So after one try, they have decided that it not worth the time.
Not surprising, man-hole covers are being "recycled".
Hammer throwing is a sport in Olympics but aiming it to a car windshield is not one & neither is this person an Olympian.
This is the invoice & receipt for the underground pipe fixing, only left the tarring of the "hole". This needs the sand to be compressed first.
These are some of the bills. Each block has a common area & the main power supply to the grundfos pumps also uses electricity.